Configuring a relative sample path step allows users to optionally have the sample step relative to a previously created sample step for timing. Additionally, if a given step is relative to a previous batch step, the timing of the current step will be based on either the start or stop of the previous step. This timing will apply to the countdown timer and calculated deviations.
Configure Sample Path Step
By selecting a Relative Sample Path Step the timing for the step being added will be calculated off the selected Relative Sample Path Step.
If the relative sample path step is a batch step:
Workflow for Relative Sample Path Step / Relative to Batch Stop
INSERT VIDEO HERE
Workflow for Sample Path Step / Relative to Batch Start
INSERT VIDEO HERE